Basic parameters:

Small hydro power Nová Dedinka
Maximum upper water level 127.50 m a.s.l.
Minimum upper water level 126.60 m a.s.l.
Downstream water level at Q30 123.80 m a.s.l.
Downstream water level Q18 123.10 m a.s.l.
Designed head 4.10 m
Minimum head 3.40 m
Designed discharge of SHP 2 x 18 m3.s-1
Maximum discharge of SHP 36 m3.s-1
Type of turbines Horizontal Kaplan
Number of turbines 2 pcs
Runner diameter 1,900 mm
Nominal revolutions of the turbine 187 min-1
Nominal revolutions of the generator 500 min-1
Installed capacity 984.0 kW
Maximum power at the generator terminals 593.6 kW
Achievable electricity production in 334 days 6,685,906 kWh

Small hydro power Nová Dedinka:

SHP uses a hydro-energetic potential of the weir near Nová Dedinka on the Little Danube river, which in the past served exclusively for water management. The building of SHP was built in the place of the right-side front dam. The construction consists of two monolithic blocks founded on a drop caisson. Electricity is produced by two asynchronous generators for voltage of 6.3 kV.

Do not hesitate to contact us.