Basic parameters:
Maximum upper water level | 115.20 m a.s.l. |
---|---|
Minimum upper water level | 114.70 m a.s.l. |
Downstream water level at Q40 | 112.30 m a.s.l. |
Downstream water level at Q20 | 112.00 m a.s.l. |
Designed gross head | 2.9 m |
Designed net head | 2.7 m |
Designed discharge of SHPP | 2 x 20 m3.s-1 |
Maximum discharge of SHPP | 40 m3.s-1 |
Type of turbines | Horizontal Kaplan |
Number of turbines | 2 pcs |
Runner diameter | 2,100 mm |
Nominal revolutions of the turbine | 165 min-1 |
Nominal revolutions of the generator | 750 min-1 |
Installed capacity | 880.0 kW |
Maximum power at the generator terminals | 440 kW |
Achievable electricity production in 334 days | 6,160,000 kWh |
Small hydro power Veľké Blahovo:
The existing weir Čierna Voda, which serves for water management based on needs of the adjacent area, at the same time has a hydro-energetic potential, which was used in SHP called Veľké Blahovo. The SHPP construction was raised in the place of right-side front dam. It consists of two decisive monolithic objects, namely SHPP building and an intake structure. The foundation of both objects is realized by means of prefabricated underground walls with injected bed. Electricity is produced by two asynchronous generators for voltage of 0.4kV.