Designed construction SHPP Švošov has the following parameters:
WEIR
Number of fields (vents) |
2 |
Height of the gate |
5.3 m |
Width of the weir field |
12.00 m |
Gate construction |
2 x radial flap with pressed arms |
Upper channel bottom elevation of the weir |
447.00 m a.s.l. |
Downstream channel bottom elevation |
445.60 m a.s.l. |
Upper max. operational water level |
452.30 m a.s.l. |
Q100 upper water level |
452.73 m a.s.l. |
Q100 downstream water level |
451.83 m a.s.l. |
SHPP
Maximum upper operational water level |
452.30 m a.s.l. |
Downstream water level at Q=20 m3s-1 |
447.90 m n.m. |
Designed discharge |
2×25 m3.s-1 |
Designed gross head |
4.40 m |
Designed net head |
4.20 m |
Turbine type |
Kaplan |
Runner diameter |
D = 2.000 mm |
Number of turbines |
2 pcs |
Max. active power of one aggregate |
858.5 kW |
Installed capacity |
1,800 kW |
Estimated electricity production in an average wet year is amounting to 8,972,940 kWh (8,972 MWh).
Basic characteristics of the construction and its future operation:
SHPP Švošov is designed to utilize hydro-energetic potential of Váh River in its upper section. The small hydro power plant is located approximately 1.6 km far from a municipality Švošov. The designed maximum usable flow takes into account average discharges in a particular location. Maximum usable flow of one turbine is 25.00 m3.s-1.
MVE Švošov consists of a weir, corridor for migration of fish and building of the power plant. Partially, it is designed in the riverbed and, partially, on the right riverbank. The building of SHPP together with the corridor for migration of fish is located in the riverbed and the weir is on the right bank of Váh River.