The construction is characterized by these basic information on it operational capacities:

Water work Sereď
Upper operational level 139.50 m a.s.l.
Downstream operational level 124.00 m a.s.l.
Maximum gross head 15.50 m
Type of turbine Kaplan vertical turbine
Number of turbines 2 pcs
Runner diameter 4,950 mm
Maximum dischrage of the turbines 2 x 150 m3.s-1
Installed capacity of PG 2 x 19,50 MW
Yearly production in an average wet year 129.92 GWh

Basic characteristics of the construction and its future operation:

Water work Sereď is planned to be place in the inundation area of Váh River, in the section defined by the end of WW Kráľová reservoir and by the outlet channel of a hydro power plant Madunice. After consideration of all conditions influencing the solution proposal, the derivation scheme was chosen for this project.

Waterwork Sereď consists of these main construction structures:

  • Reservoir Siladice
  • Weir Siladice
  • Intake Channel
  • HydroPlant Sereď
  • Outlet channel
  • Adjustments of River Váh in the section Siladice – Sereď
  • Decontamination of riverbank collapses
  • Power transmission