The construction is characterized by these basic information on it operational capacities:
Upper operational level | 139.50 m a.s.l. |
---|---|
Downstream operational level | 124.00 m a.s.l. |
Maximum gross head | 15.50 m |
Type of turbine | Kaplan vertical turbine |
Number of turbines | 2 pcs |
Runner diameter | 4,950 mm |
Maximum dischrage of the turbines | 2 x 150 m3.s-1 |
Installed capacity of PG | 2 x 19,50 MW |
Yearly production in an average wet year | 129.92 GWh |
Basic characteristics of the construction and its future operation:
Water work Sereď is planned to be place in the inundation area of Váh River, in the section defined by the end of WW Kráľová reservoir and by the outlet channel of a hydro power plant Madunice. After consideration of all conditions influencing the solution proposal, the derivation scheme was chosen for this project.
Waterwork Sereď consists of these main construction structures:
- Reservoir Siladice
- Weir Siladice
- Intake Channel
- HydroPlant Sereď
- Outlet channel
- Adjustments of River Váh in the section Siladice – Sereď
- Decontamination of riverbank collapses
- Power transmission